Trains and Timetables

More Trains / Better Trains / Electric Trains

As your local Member I will be pursuing region wide public transport solutions. In the short term I believe we should be petitioning the department and the Minister for electrification in order to allow for more trains; newer trains; eliminating stop overs; and improving timetable accessibility and frequency.

Please sign - If you believe and integrated transport solution is required before urban growth.

Sign the petition

0

of a 500 signature goal

Will you sign?